WGC BY THE NUMBERS

1st Skyscraper in Los Angeles without a flat roof

66 Trees

73 Stories 

889 Hotel Rooms

$1.35 Billion in Cost to Build

​1,100 ft Height to top of Spire

934 ft Height to top of Crown

1,236,992 sq ft of floor area

38 elevators; 14 escalators

The Big Pour:
21,200 cubic yards of concrete poured, weighing more than 82 million pounds.  That's the same weight as about 250 blue whales - the world's largest animal.

It took 2,120 truckloads to cmplete the concrete pour.  If you lined up all the trucks, that would take you from DTLA to Santa Monica.

A pour of this magnitude required a total of 100,000 feet of polyethlene tubing.  The rebar weighed more than 6.6 million pounds, the same weight as 82 big rigs.

The concrete took a whopping 14 days to cure, helped by 60 tons of chillers, six water pumps and two 20,0000 gallon storage tanks.

 